To Whom May It Concern,
We kindly request your company (“Contractor”) attend a competitive offer for Package:
“Monitoring of subsidence, displacement and tilt in the structures of Duyen Hai 2 Thermal Power Plant” at Dan Thanh commune, Duyen Hai town, Tra Vinh province
Scope of work
The purpose and requirements of works.
Determining subsidence, displacement and tilt of structures in the plant in operation period.
Alerting Incidence based on design standards.
The results of subsidence, displacement and tilt measurements used to assess, verify the theory of design solutions for foundation. At the same times it is also the basis for making the necessary measures to prevent incidents that may occur.
With the table of quantity (refer to Appendix 1) and the scope of work as follows:
- Make a monitoring plan.
- Carry out monitoring of subsidence, displacement and tilt of the plant.
- Submit monitoring results report, summary report and evaluation.
- Repair or replace corroded settlement points (if any)
For more detail, please find the RFQ as attached